We build the emissions inventory first, then a decarbonisation pathway that is costed, sequenced and honest about what is achievable with today's grid.
Most net-zero commitments fail at the same point: the target is set before anyone has measured the baseline, so there is no way to know what the target requires. We work in the other order.
Build the inventory first
A greenhouse gas inventory under the GHG Protocol means setting organisational and operational boundaries, then quantifying:
- Scope 1 covers direct emissions from sources you control. Fuel combustion, company vehicles, and refrigerant leakage, which in a tropical building portfolio is material and routinely overlooked.
- Scope 2 covers purchased electricity. In Malaysia this usually dominates, and it is governed by the grid emission factor, which is outside your control and improving slowly.
- Scope 3 covers the material categories only. Purchased goods and services, waste, business travel, and for developers the large ones: capital goods and the use-phase emissions of what you sell.
Scope 3 is where inventories become unmanageable, so we scope it deliberately. A defensible inventory covering the categories that matter beats an exhaustive one that cannot be maintained.
Then be honest about the grid
This is the part most decarbonisation plans skip. In Malaysia, the emission factor of the national grid sets a floor under any Scope 2 reduction that is not achieved through consumption reduction or procured renewables. The National Energy Transition Roadmap sets the trajectory for that factor to improve, but the improvement is gradual and it is not yours to accelerate.
What that means in practice: between now and the early 2030s, the reductions you control are the ones that come from using less energy, from on-site generation, and from procuring renewable supply. A pathway that quietly relies on the grid decarbonising to hit its target is a pathway that has outsourced its own commitment.
We will also be blunt about rooftop solar. On a low-rise building with a large roof it can be transformative. On a tower it cannot: one of the buildings we assess runs rooftop PV contributing 0.26% of consumption, because a 38-storey building has one roof and 38 floors to serve. Both facts are useful; conflating them is how a plan loses credibility.
Then sequence and cost it
We build a marginal abatement cost curve, so measures are ordered by cost per tonne rather than by visibility, and a sequenced pathway to your target year with the capital requirement in each period. Measures that pay for themselves come first and fund the ones that do not.
For new development we assess embodied and whole-life carbon, because on an efficient building the embodied share is no longer a rounding error, and the decisions that govern it (structural system, concrete mix, facade) are made very early and are expensive to revisit.
What you get
An inventory you can report and have assured, a pathway that is costed and sequenced, and a clear statement of what is within your control and what is not. Targets set this way survive contact with a board.